Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
en:services:general_services:software_and_license_management:sleslics [2015/08/18 16:02] – [SLES (SUSE Linux Enterprise Server)] wgriege | en:services:general_services:software_and_license_management:sleslics [2015/11/02 14:44] (current) – [Orders] wgriege | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== SLES ====== | ||
+ | ===== SLES (SUSE Linux Enterprise Server) ===== | ||
+ | |||
+ | To use the operating system SLES (SUSE Linux Enterprise Server) the GWDG provides low cost licenses that are made possible due to large bulk orders at the company [[http:// | ||
+ | |||
+ | ===== Usage Restrictions ===== | ||
+ | |||
+ | The licenses can only be used for computers of the Max Planck Society, the University of Göttingen and the GWDG for x86 / AMD64 / Intel EM64T / Itanium / IBM PowerPC systems. | ||
+ | |||
+ | ===== License period and costs ===== | ||
+ | |||
+ | A license period is five years and currently covers the period from 01.05.2013 until 30.04.2018. | ||
+ | |||
+ | The cost per license per year during this period do not include 19 % VAT as follows: | ||
+ | |||
+ | 1-2 Sockets - HPC: 16,20 EUR / year, Server: 97.20 EUR / year \\ | ||
+ | 4 sockets - HPC: 32.40 EUR / year, Server: 194.40 EUR / year \\ | ||
+ | 8 sockets - HPC 54,00 EUR / year, Server: 324.00 EUR / year | ||
+ | |||
+ | HA functionality costs additionally 66,00 EUR for 1-2 Sockets and per year. | ||
+ | |||
+ | HPC cluster nodes are systems that are fitted with an identical configuration in a cluster with at least 8 nodes. | ||
+ | |||
+ | ===== Orders ===== | ||
+ | |||
+ | Orders can be placed directly to the GWDG, either by e-mail to [[support@gwdg.de? | ||
+ | |||
+ | GWDG \\ | ||
+ | SLES-order \\ | ||
+ | Postfach 28 41 \\ | ||
+ | 37018 Göttingen | ||
+ | |||
+ | Please do not forget to specify the number of licenses required and the billing address in both cases. | ||
+ | |||
+ | Upon receipt of the order by e-mail, you will receive a confirmation by e-mail followed by the bill in the mail. After receipt of the order by letter or fax the invoice serves as confirmation. | ||
+ | |||
+ | **ATTENTION**: |